The nuclear reactor cooling function of the second in nuclear power plant (Fukushima Prefecture Okuma-cho and Futaba-cho) in Tokyo Electric Power Company Fukushima first machine stopped on the March 11th due to the large earthquake off the coast of Sanriku.
The power source car of Tokyo Electric Power Company arrives, and recovery efforts are sped up.
The government assumed that there was fear of the radiation leak to the outside on the night of the same day, too, directed 5862 both town residents within three kilos in the radius the emergency evacuation, and announced the nuclear disaster emergency declaration officially.
There is no radiation leak to the outside so far.
No comments:
Post a Comment